
Sidewalks in Eastern Idaho take punishment from frost heave, snow removal, and daily foot traffic. A sidewalk poured without proper sub-base preparation and joint placement will crack and heave within a few winters.
We pour sidewalks with compacted gravel sub-base, proper thickness for the application, and control joints spaced to manage where cracking happens — so it happens in straight lines inside the joints, not random cracks across the surface.
If your existing sidewalk is heaved, cracked, or broken, we handle full removal and replacement as well.
What's Included
- Compacted gravel sub-base for frost heave resistance
- 4-inch thickness for residential applications
- Control joints at proper intervals
- Clean broom finish for traction
- Existing sidewalk removal and disposal available
- All-inclusive written quote

Technical Details
Typical Width3–5 feet
Thickness4 inches
Sub-base4–6 inches compacted gravel
Joint SpacingPer ACI recommendations
